Approximate flat pack lead times. 2-3 days for Stocked Parts, 1-2 weeks for Small Cut Parts, Ply Lining & Floors, 5-6 weeks for Small Van Furniture, e.g., T5/6 kits, 6-7 weeks for Large Van Furniture, e.g., Sprinter & Crafter kits. If time sensitive please contact.
“Mito table rail” has been added to your basket. View basket
New
Bamboo Chopping boards (Individual or set)
£ 0.00 inc vat
Bamboo chopping boardsĀ
16mm Thick Bamboo – UNVARNISHED – Pre rounded corners and edges.
Designed to fit in our unit drawers.
The chopping board can be stored above a cutlery tray in a drawer.
Lead Time for this product: 2-3 days?Any lead time quoted is an estimate only and should not be relied upon as a guarantee
Lead time for multiple products is sent with the product that has the longest lead time. If products are added together, the grouped lead time for the whole order is calculated and may be the longer lead time. See the checkout for the overall basket lead time.