Approximate flat pack lead times. 2-3 days for Stocked Parts, 1-2 weeks for Small Cut Parts, Ply Lining & Floors, 6-7 weeks for Small Van Furniture, e.g., T5/6 kits, 7-8 weeks for Large Van Furniture, e.g., Sprinter & Crafter kits. If time sensitive please contact.

Window inner frame + Bamboo frame

Only suitable for converters or skilled individuals, frames will need scribing , cutting (angle grinder) and sanding to get a good fit. The back of the shower panel will also need bracing from behind.

Comes in 2 parts to buy , the bamboo frame would need bonding in place and sealing with vanish. The fibre glass inner will need scribing , cutting and sealing against the aluminium inner window frame.

Window Details:

  • Horrex Window (mayfit dometic s7 window untested 6/3/2024 )
  • Measurements: 280W x 380H
  • The window surround is designed to be used at a certain depth ( approx 75mm ) as the inside of the surround tapers.

Lead Time for this product: 1-2 weeks?Any lead time quoted is an estimate only
and should not be relied upon as a guarantee

Lead time for multiple products is sent with the product that has the longest lead time. If products are added together, the grouped lead time for the whole order is calculated and may be the longer lead time. See the checkout for the overall basket lead time.
Choose parts