Approximate flat pack lead times. 2-3 days for Stocked Parts, 1-2 weeks for Small Cut Parts, Ply Lining & Floors, 6-7 weeks for Small Van Furniture, e.g., T5/6 kits, 7-8 weeks for Large Van Furniture, e.g., Sprinter & Crafter kits. If time sensitive please contact.

Shower B Alcove + Bamboo surround

£ 110.00 inc vat

Only suitable for converters or skilled individuals, frames will need scribing , cutting (angle grinder) and sanding to get a good fit. The back of the shower panel will also need bracing from behind.

1 fibre glass part designed for the shower B cubicle with bamboo surround panel

**Does not include window side.**

 

Lead Time for this product: 7-8 weeks?Any lead time quoted is an estimate only
and should not be relied upon as a guarantee

Lead time for multiple products is sent with the product that has the longest lead time. If products are added together, the grouped lead time for the whole order is calculated and may be the longer lead time. See the checkout for the overall basket lead time.

Privacy Preference Center