Approximate flat pack lead times. 1-2 weeks for small cut parts, ply lining & floors, 3-4 weeks for T5, T6 kits, 4-5 weeks for Sprinter & Crafter kits. Lead time can vary with different finishes, if time sensitive please contact. Dismiss
Skip to content
Smev 9222 right hand sink hob
Table leg adjustable height
Table A (Side Door Fold up in Bamboo)
Bamboo Plywood 16mm thick - 10 x Sheets 1220mm x 2440mm ( DELIVERY AT £195 )
Foam set for U shape swb (covers not supplied)
Subtotal: £ 2,736.50
Smev 9222 right hand sink hob
Table leg adjustable height
Table A (Side Door Fold up in Bamboo)
Bamboo Plywood 16mm thick - 10 x Sheets 1220mm x 2440mm ( DELIVERY AT £195 )
Foam set for U shape swb (covers not supplied)
Subtotal: £ 2,736.50