Approximate flat pack lead times. 2-3 days for Stocked Parts, 1-2 weeks for Small Cut Parts, Ply Lining & Floors, 5-6 weeks for Small Van Furniture, e.g., T5/6 kits, 6-7 weeks for Large Van Furniture, e.g., Sprinter & Crafter kits. If time sensitive please contact.

Twin water bottles kit 12 litre ( 2 solid caps & 2 special caps )

£ 66.50 inc vat

Twin water bottles, normally situated under the bed to the side of the units.

– 2 x 12 litre water bottle

– with 2 solid lids , 2 special cap lids

– submersible pump, 1.2m hose pipe , 1.2m waste pipe

These fit under the beds

Lead Time for this product: 2-3 days?
Any lead time quoted is an estimate only
and should not be relied upon as a guarantee

Lead time for multiple products is sent with the product that has the longest lead time. If products are added together, the grouped lead time for the whole order is calculated and may be the longer lead time. See the checkout for the overall basket lead time.