Approximate flat pack lead times. 2-3 days for Stocked Parts, 1-2 weeks for Small Cut Parts, Ply Lining & Floors, 5-6 weeks for Small Van Furniture, e.g., T5/6 kits, 6-7 weeks for Large Van Furniture, e.g., Sprinter & Crafter kits. If time sensitive please contact.

MITO Rail + Table top 700 x 450mm + Leg

£ 70.00 inc vat

Table top with leg and rail, supplied with T edge trim to be applied.

  • Table 700mm x 450mm
  • Table leg 720mm this can be cut down.
  • Aluminum table rail and plastic fixings
  • 2.5 m T edge trim

Lead Time for this product: 2-3 days?1 working day to goAny lead time quoted is an estimate only
and should not be relied upon as a guarantee

Lead time for multiple products is sent with the product that has the longest lead time. If products are added together, the grouped lead time for the whole order is calculated and may be the longer lead time. See the checkout for the overall basket lead time.

CPL – Continuous Pressure Laminate
HPL – High Pressure Laminate ( More wear resistant 0.8mm thick )
SD – Suede Finish

ORDER NOTES

Please add any additional information that you have discussed with us.