Approximate flat pack lead times. 2-3 days for Stocked Parts, 1-2 weeks for Small Cut Parts, Ply Lining & Floors, 6-7 weeks for Small Van Furniture, e.g., T5/6 kits, 7-8 weeks for Large Van Furniture, e.g., Sprinter & Crafter kits. If time sensitive please contact.
“SILVER Tambour door for Shower Toilet cubicle 2000 x 600 mm” has been added to your basket. View basket
Shower B Window Frame + Alcove
£ 210.00 inc vat
Only suitable for converters or skilled individuals, frames will need scribing , cutting (angle grinder) and sanding to get a good fit. The back of the shower panel will also need bracing from behind.
2 fibre glass parts designed for the shower B cubicle with bamboo surround panel
Window NOT INCLUDED, just the fibreglass and bamboo frames/surround panels
Intended window Details:
Horrex Window
Measurements: 280W x 380H
Designed to work on a RHD 2017+ MWB crafter with the shower installed on the drivers side.
Lead Time for this product: 1-2 weeks?Any lead time quoted is an estimate only and should not be relied upon as a guarantee
Lead time for multiple products is sent with the product that has the longest lead time. If products are added together, the grouped lead time for the whole order is calculated and may be the longer lead time. See the checkout for the overall basket lead time.