Approximate flat pack lead times. 2-3 days for Stocked Parts, 1-2 weeks for Small Cut Parts, Ply Lining & Floors, 6-7 weeks for Small Van Furniture, e.g., T5/6 kits, 7-8 weeks for Large Van Furniture, e.g., Sprinter & Crafter kits. If time sensitive please contact.

Bamboo Shower Board

£ 90.00 inc vat

16mm solid Bamboo slatted shower board ( Duck board ).

Ultra durable.

Supplied unfinished. Apply several thin coats of varnish to ensure the bamboo is fully sealed.

Supplied with stainless steel screws.

Lead Time for this product: 2-3 days?Any lead time quoted is an estimate only
and should not be relied upon as a guarantee

Lead time for multiple products is sent with the product that has the longest lead time. If products are added together, the grouped lead time for the whole order is calculated and may be the longer lead time. See the checkout for the overall basket lead time.

Please select your shower tray model