Approximate flat pack lead times. 2-3 days for Stocked Parts, 1-2 weeks for Small Cut Parts, Ply Lining & Floors, 5-6 weeks for Small Van Furniture, e.g., T5/6 kits, 6-7 weeks for Large Van Furniture, e.g., Sprinter & Crafter kits. If time sensitive please contact.

SHOWER TRAY A1 ( Fits the THETFORD 220 & 260 series )

£ 264.00 inc vat

Shower tray suitable for our Shower A design moulded in tough fibre glass to avoid the splinting and cracking associated with flimsy vacuum formed plastic ones. This shower tray is designed to accept the:

THETFORD 220 ( 223 ) & 260 ( 263 ) series

The tray is a deeper design allowing for heating duct work to travel under the back edge of the shower so you can direct hot air to both the front and back of the van.

Trimmed to suit SHOWER A  670 x 940 mm. ( Finished tray size )

Toilet not included .

Bamboo foot board is not included but is available as an optional extra

Works with this sink waste from Screwfix – MCALPINE CENTRE PIN BASIN WASTE POLISHED STAINLESS STEEL 60MM (894JJ)

Lead Time for this product: 2-3 days?
Any lead time quoted is an estimate only
and should not be relied upon as a guarantee

Lead time for multiple products is sent with the product that has the longest lead time. If products are added together, the grouped lead time for the whole order is calculated and may be the longer lead time. See the checkout for the overall basket lead time.
Optional Extras